FAST-TRACKING EV CHARGER INSTALLATIONS

By combining all switchgear equipment into one enclosure, NexPhase™ eliminates the lengthy design process of traditional post-and-frame systems, which require additional costs to design and source a mixed-manufacturer panel system.

Once on-site, NexPhase™ only requires the on-site connections for the incoming power and outgoing charger connections, drastically reducing installation time and costs.

LEARN MORE